Book Details : | |
---|---|
Language | English |
Pages | 324 |
Format | |
Size | 10.00 MB |
The Riverside County Transportation Commission (RCTC) has created an Agency Quality Management Plan (AQMP) to comply with the Project Quality Program required under the Cooperative Agreement for Design-Build between the California Department of Transportation (Caltrans) and RCTC. (Agency Quality Management Plan Volume III)
It also covers the Caltrans Quality Assurance Program requirements applicable to a design-build project with the required Assembly Bill (AB) 2098 personnel structure. (Agency Quality Management Plan Volume III)
The State Route 91 (SR-91) Corridor Improvement Project (Project) will extend the two SR-91 Express Lanes in each direction and will construct one general-purpose (GP) lane in each direction from the Orange County line to Interstate 15 (I-15) in Riverside County, a distance of approximately 8 miles.
The Project limits along I-15 begin at the SR-91/I-15 interchange and extend south approximately 3 miles, ending near Ontario Avenue in Corona. (Agency Quality Management Plan Volume III)
Tolled Express Lane direct connectors will be provided to south I-15. The existing SR-91 will be restriped from the County line west to the State Route 241 (SR-241) interchange and east of I-15 to Pierce Street.
Recommended Free eBooks |
Building Smart Cities Analytics, ICT and Design Thinking |
Construction Contracts Law and Management |
Project Phases
To provide a clearer definition and control of the overall program, the Project has been divided into two major phases for delivery: Phase I, Project Development; and Phase II, Design-Build.
The major objectives of the two major phases for the delivery of the Project are described below. (Agency Quality Management Plan Volume III)
Download Agency Quality Management Plan Design Build Construction Manual easily in PDF format for free.